PORT BIENVILLE SITE 03
176-ACRE HEAVY INDUSTRIAL SITE
Port Bienville Site 03 is a 176-acre heavy-industrial development opportunity located in Hancock County on the Mississippi Gulf Coast, within the 3,600-acre Port Bienville Industrial Park.
The primarily wooded property includes approximately 35 acres currently estimated as upland and offers access from Port and Harbor Drive, with additional connectivity from Lower Bay Road and Road C. Adjacent rail infrastructure, established industrial utilities, and proximity to Port Bienville’s marine facilities position Site 03 for heavy manufacturing, industrial logistics, and other projects able to incorporate additional site development and environmental due diligence.

176-Acres
Heavy Industrial Site
Utilities
Available
Rail
Adjacent
Port Facilities
Nearby
PROPERTY OVERVIEW
Port Bienville Site 03 provides 176 acres for heavy-industrial development within the Port Bienville Industrial Park. The property is primarily wooded with some cleared areas and offers frontage along Port and Harbor Drive, with additional access from Lower Bay Road and Road C.
Rail infrastructure runs adjacent to the property, creating potential for future rail-served development. Approximately 35 acres are currently estimated as upland, although formal wetlands delineation will be required to establish the final developable footprint.
Property Type:
Industrial Site
Ownership:
Hancock County Port &
Harbor Commission
Available For:
Sale or Lease
Total Acreage:
Developable Acreage:
Zoning:
Current Site Condition:
Prior Site Use:
Target Uses:
176 Acres
Approx. 35 Acres
Heavy Industrial
Primarily wooded
Undeveloped greenfield
Heavy manufacturing & industrial logistics
DEVELOPMENT READINESS
Site 03 has completed several important due diligence steps, including a boundary survey, geotechnical study, and Phase I Environmental Site Assessment, with topographic information also available.
Additional environmental work, including a formal wetlands delineation and related site-specific studies, is still needed to confirm the final developable footprint and determine any mitigation or permitting requirements.
Boundary Survey:
Completed
Phase 1 Environmental Site Assessment:
Completed
Geotechnical Study:
Complete
Topographic Data:
Available
Wetlands Delineation:
Additional Study Required
Wetlands Mitigation:
Not Completed
Cultural Resources Study:
Endangered Species Study:
Not Completed
Not Completed
Federal Wetland Permit:
Not Completed
MS Power Certified Site:
No
PHYSICAL CHARACTERISTICS
FEMA FLOOD CONDITION
Site 03 lies within FEMA Zone AE with a base flood elevation of 16 feet. Current screening information places existing ground elevation at approximately 9 feet.
Significant grading, fill, drainage, and other site-preparation work may be required depending on the final development footprint.
BASE FLOOD ELEVATION
16 feet
APPROXIMATE SITE ELEVATION
9 feet
WETLANDS
Wetlands are believed to occupy a substantial portion of the property. Based on internal mapping, approximately 35 acres are currently estimated as upland. These figures are preliminary and have not been established through a formal site-specific wetlands delineation. Final developable acreage will depend on future environmental due diligence.
SITE CONDITION
Primarily wooded with some cleared portions.
TRANSPORTATION
ROAD ACCESS
Port & Harbor Drive
ADJACENT RAIL ACCESS
Site 03 does not currently have an onsite rail spur. Existing Port Bienville rail infrastructure is adjacent to the property, and future rail connection may be evaluated as part of a development project.
NEARBY PORT ACCESS
Site 03 benefits from its location within Port Bienville and proximity to the industrial park’s marine facilities, although the property does not have direct dock frontage.
U.S HIGHWAY 90
2.7 miles / 4 minutes

INTERSTATE 10
12.3 miles / 14 minutes
AVAILABLE UTILITIES
Utility capacities and final service availability are subject to project-specific verification with the applicable utility provider.
ELECTRIC
25 kV distribution and 115 kV transmission serve Port Bienville. Current working available substation capacity is approximately 4 MW. A new Coast Electric substation project is advancing.
NATURAL GAS
Natural gas service is available within Port Bienville Industrial Park.Direct service to Site 03 and any required extension should be confirmed through project-specific utility coordination.
WATER
Port Bienville is served by 12-inch water infrastructure at approximately 55 psi. A 500,000-gallon water storage tank has been completed, and a new interconnector project is in progress to strengthen system supply and redundancy.
WASTEWATER
Port Bienville is served by the Western Regional wastewater treatment system. The current technical baseline treatment capacity is 0.2 MGD. Expansion alternatives have been studied but have not yet been constructed.
FIBER
Fiber service is available from C Spire, AT&T, and CoastConnect.