top of page

PORT BIENVILLE SITE 03

176-ACRE HEAVY INDUSTRIAL SITE

Port Bienville Site 03 is a 176-acre heavy-industrial development opportunity located in Hancock County on the Mississippi Gulf Coast, within the 3,600-acre Port Bienville Industrial Park.

 

The primarily wooded property includes approximately 35 acres currently estimated as upland and offers access from Port and Harbor Drive, with additional connectivity from Lower Bay Road and Road C. Adjacent rail infrastructure, established industrial utilities, and proximity to Port Bienville’s marine facilities position Site 03 for heavy manufacturing, industrial logistics, and other projects able to incorporate additional site development and environmental due diligence.

Port Bienville Site 01 - Site Map.png

176-Acres
Heavy Industrial Site

Utilities
Available

Rail
Adjacent

Port Facilities
Nearby

PROPERTY OVERVIEW

Port Bienville Site 03 provides 176 acres for heavy-industrial development within the Port Bienville Industrial Park. The property is primarily wooded with some cleared areas and offers frontage along Port and Harbor Drive, with additional access from Lower Bay Road and Road C.

 

Rail infrastructure runs adjacent to the property, creating potential for future rail-served development. Approximately 35 acres are currently estimated as upland, although formal wetlands delineation will be required to establish the final developable footprint.

Property Type: 

Industrial Site

Ownership:

Hancock County Port &

Harbor Commission

Available For: 

Sale or Lease

Total Acreage:

Developable Acreage:

Zoning:

Current Site Condition:

Prior Site Use:

Target Uses:

176 Acres

Approx. 35 Acres

Heavy Industrial

Primarily wooded

Undeveloped greenfield

Heavy manufacturing & industrial logistics

DEVELOPMENT READINESS

Site 03 has completed several important due diligence steps, including a boundary survey, geotechnical study, and Phase I Environmental Site Assessment, with topographic information also available.

 

Additional environmental work, including a formal wetlands delineation and related site-specific studies, is still needed to confirm the final developable footprint and determine any mitigation or permitting requirements.

Boundary Survey:

Completed

Phase 1 Environmental Site Assessment:

Completed

Geotechnical Study:

Complete

Topographic Data:

Available

Wetlands Delineation:

Additional Study Required

Wetlands Mitigation:

Not Completed

Cultural Resources Study:

Endangered Species Study:

Not Completed

Not Completed

Federal Wetland Permit:

Not Completed

MS Power Certified Site:

No

PHYSICAL CHARACTERISTICS

FEMA FLOOD CONDITION

Site 03 lies within FEMA Zone AE with a base flood elevation of 16 feet. Current screening information places existing ground elevation at approximately 9 feet.

 

Significant grading, fill, drainage, and other site-preparation work may be required depending on the final development footprint.

BASE FLOOD ELEVATION

16 feet

APPROXIMATE SITE ELEVATION

9 feet

WETLANDS

Wetlands are believed to occupy a substantial portion of the property. Based on internal mapping, approximately 35 acres are currently estimated as upland. These figures are preliminary and have not been established through a formal site-specific wetlands delineation. Final developable acreage will depend on future environmental due diligence.

SITE CONDITION

Primarily wooded with some cleared portions.

TRANSPORTATION

ROAD ACCESS

Port & Harbor Drive

ADJACENT RAIL ACCESS

Site 03 does not currently have an onsite rail spur. Existing Port Bienville rail infrastructure is adjacent to the property, and future rail connection may be evaluated as part of a development project.

NEARBY PORT ACCESS

Site 03 benefits from its location within Port Bienville and proximity to the industrial park’s marine facilities, although the property does not have direct dock frontage.

ChatGPT Image Aug 11, 2026, 03_13_38 PM_

U.S HIGHWAY 90

2.7 miles / 4 minutes

ChatGPT Image Aug 11, 2026, 03_13_52 PM_

INTERSTATE 10

12.3 miles / 14 minutes

AVAILABLE UTILITIES

Utility capacities and final service availability are subject to project-specific verification with the applicable utility provider.

ELECTRIC

25 kV distribution and 115 kV transmission serve Port Bienville. Current working available substation capacity is approximately 4 MW. A new Coast Electric substation project is advancing.

NATURAL GAS

Natural gas service is available within Port Bienville Industrial Park.Direct service to Site 03 and any required extension should be confirmed through project-specific utility coordination.

WATER

Port Bienville is served by 12-inch water infrastructure at approximately 55 psi. A 500,000-gallon water storage tank has been completed, and a new interconnector project is in progress to strengthen system supply and redundancy.

WASTEWATER

Port Bienville is served by the Western Regional wastewater treatment system. The current technical baseline treatment capacity is 0.2 MGD. Expansion alternatives have been studied but have not yet been constructed.

FIBER

Fiber service is available from C Spire, AT&T, and CoastConnect.

ChatGPT Image Aug 12, 2026, 08_58_01 AM.png

VIEW INTERACTIVE GIS MAP

Explore Site 03 and surrounding infrastructure with our interactive GIS mapping platform. 

SITE DOCUMENTS

INTERESTED IN SITE 03?

Our economic development team is available to provide additional site information, utility coordination, due diligence materials, and assistance evaluating our sites for your project.

228.467.9231

bottom of page