top of page

PORT BIENVILLE SITE 01

475-ACRE HEAVY INDUSTRIAL SITE

Port Bienville Site 01 is a premier large-scale industrial development opportunity located in Hancock County on the Mississippi Gulf Coast, within the 3,600-acre Port Bienville Industrial Park. The 475-acre property offers approximately 256 developable acres, including a 99.81-acre permitted development area supported by extensive environmental due diligence and site-preparation investment.

 

With direct rail access, nearby marine facilities, established utility infrastructure, and strong regional highway connections, Site 01 is positioned to support major manufacturing and heavy-industrial projects requiring scale, multimodal access, and room for long-term expansion.

Port Bienville Site 01 - Site Map.png

475-Acres
Heavy Industrial Site

All Utilities
Available

Rail
Available

Port Facilities
Available

PROPERTY OVERVIEW

Port Bienville Site 01 offers 475 acres within the Port Bienville Industrial Park for large-scale industrial development. The property is primarily wooded greenfield land, with an approximately 99.81-acre development area that has completed extensive environmental and technical due diligence and received federal wetland permitting.

 

The site is well suited for major manufacturing and other heavy-industrial projects requiring significant acreage, rail connectivity, and access to Port Bienville’s transportation and utility infrastructure.

Property Type: 

Industrial Site

Ownership:

Hancock County Port &

Harbor Commission

Available For: 

Sale or Lease

Total Acreage:

475 Acres

Developable Acreage:

256 Acres

Permitted Development Area:

99.81 Acres

Zoning:

Heavy Industrial

Current Site Condition:

Primarily wooded greenfield, with permitted development area advancing towards clearing.

Target Industries:

Heavy Manufacturing, Chemicals, Polymers, Metals, Machinery

Site Certifications:

  • CSX Bronze Certification

  • Cooperative Energy SiteInvest - Tier 3 Status

  • Mississippi Development Authority - Select Site

Complete

Complete for permitted area

DEVELOPMENT READINESS

Site 01 has undergone substantial environmental and technical due diligence. An approximately 99.81-acre portion of the property has completed the permitting and mitigation process required to advance site preparation, significantly reducing early-stage development uncertainty for a prospective industrial project. 

​

The permitted area is currently being cleared of trees and vegetation. This activity will be completed in Q4 2026. 

Complete

Complete

Complete

Complete

Complete

Complete for permitted area

Complete

Bronze

Boundary Survey:

Phase 1 Environmental Site Assessment:

Geotechnical Study:

Topographic Data:

Wetlands Delineation:

Wetlands Mitigation:

Cultural Resources Study:

Endangered Species Study:

Federal Wetland Permit:

CSX Site Certification:

PERMITTED DEVELOPMENT AREA

Within the larger 475-acre property, approximately 99.81 acres have advanced through federal permitting for industrial development

99.81
ACRES

72.80
ACRES

Permitted Development Footprint

Planned For Fill
&
Site Development

Wetland impacts associated with the permitted development area have been addressed through the required mitigation process

PHYSICAL CHARACTERISTICS

FEMA FLOOD CONDITION

Portions of the property are within FEMA Zone AE, with higher ground elsewhere on the site.

BASE FLOOD ELEVATION

18 feet in the applicable lower area

APPROXIMATE SITE ELEVATION

Range of 12 - 18 feet

Within the larger 475-acre property, approximately 100 acres have advanced through federal permitting for industrial development

TRANSPORTATION

ROAD ACCESS

South Road

RAIL ACCESS

Direct rail access via Port Bienville Shortline Railroad.

MARINE ACCESS

Marine access available through Port Bienville docks. Site 01 does not have direct dock frontage.

ChatGPT Image Aug 11, 2026, 03_13_38 PM_

U.S HIGHWAY 90

2.7 miles / 4 minutes

ChatGPT Image Aug 11, 2026, 03_13_52 PM_

INTERSTATE 10

12.3 miles / 14 minutes

WETLANDS

Wetlands are present within the larger 475-acre property.

​

A wetlands delineation has been completed, and the approximately 100-acre development area has completed the applicable federal permitting and mitigation process to support a heavy industrial manufacturing project. 

​

Development of the permitted area will require grading and fill material to establish an acceptable elevation for industrial development. 

AVAILABLE UTILITIES

Utility capacities and final service availability are subject to project-specific verification with the applicable utility provider.

ELECTRIC

25 kV distribution and 115 kV transmission serve Port Bienville. Current working available substation capacity is approximately 4 MW. A new Coast Electric substation project is advancing.

NATURAL GAS

Natural gas service is provided by Delta Utilities through a 6-inch line at approximately 315 psi. 

WATER

Port Bienville is served by 12-inch water infrastructure at approximately 55 psi. A 500,000-gallon water storage tank has been completed, and a new interconnector project is in progress to strengthen system supply and redundancy.

WASTEWATER

Port Bienville is served by the Western Regional wastewater treatment system. The current technical baseline treatment capacity is 0.2 MGD. Expansion alternatives have been studied but have not yet been constructed.

FIBER

Fiber service is available from C Spire, AT&T, and CoastConnect.

ChatGPT Image Aug 12, 2026, 08_58_01 AM.png

VIEW INTERACTIVE GIS MAP

Explore Site 01 and surrounding infrastructure with our interactive GIS mapping platform. 

SITE DOCUMENTS

INTERESTED IN SITE 01?

Our economic development team is available to provide additional site information, utility coordination, due diligence materials, and assistance evaluating our sites for your project.

228.467.9231

bottom of page