top of page

PORT BIENVILLE SITE 05

67-ACRE HEAVY INDUSTRIAL SITE

Port Bienville Site 05 is a 67-acre heavy-industrial greenfield property with access from Webre Road and South Port Bienville Road. Approximately 35.5 acres are currently estimated as upland based on historical wetlands information, providing a development opportunity for industrial users prepared to complete updated environmental due diligence and site preparation.

Port Bienville Site 01 - Site Map.png

67-Acres
Heavy Industrial Site

Utilities
Available

Port Facilities
Available

PROPERTY OVERVIEW

Port Bienville Site 05 offers 67 acres of heavy-industrial greenfield within the Port Bienville Industrial Park. The property is primarily wooded and is accessed from Webre Road and South Road. Historical wetlands information identifies approximately 31.5 acres of forested wetlands, leaving an estimated 35.5 acres of upland area. Updated environmental due diligence will be needed to confirm the final developable footprint.

​

​

 

Property Type: 

Industrial Site

Ownership:

Hancock County Port &

Harbor Commission

Available For: 

Sale or Lease

Total Acreage:

Developable Acreage:

Zoning:

Current Site Condition:

Prior Site Use:

Target Uses:

76 Acres

Approx. 35 Acres

Heavy Industrial

Primarily wooded

Undeveloped greenfield

Heavy manufacturing & industrial logistics

DEVELOPMENT READINESS

Site 05 has completed boundary and topographic work and has historical wetlands information available. Additional environmental and technical due diligence is needed to confirm current wetland conditions, final developable acreage, and project-specific site requirements.

Boundary Survey:

Completed

Phase 1 Environmental Site Assessment:

Not Completed

Geotechnical Study:

Not Completed

Topographic Data:

Available

Wetlands Delineation:

Preliminary JD Only

Wetlands Mitigation:

Not Completed

Cultural Resources Study:

Endangered Species Study:

Not Completed

Not Completed

Federal Wetland Permit:

Not Completed

MS Power Certified Site:

No

PHYSICAL CHARACTERISTICS

FEMA FLOOD CONDITION

Site 05 lies entirely within FEMA Zone AE, with base flood elevations ranging from approximately 16 to 18 feet.

 

Existing ground elevations vary from roughly 8 to 16 feet. Final grading, fill, drainage, and finished-floor requirements should be established through project-specific engineering.

BASE FLOOD ELEVATION

16 feet to 18 feet

APPROXIMATE SITE ELEVATION

8 feet to 16 feet

WETLANDS

Working Wetlands Estimate: Approx. 31.5 acres

Working Uplands Estimate: Approx. 35.5 acres

​

A 2015 preliminary jurisdictional determination identified approximately 31.5 acres of forested wetlands on the property. Based on that historical information, approximately 35.5 acres are currently treated as upland for screening purposes. An updated jurisdictional review is recommended before final development planning.

SITE CONDITION

Wooded greenfield

TRANSPORTATION

ROAD ACCESS

South Road

NEARBY PORT ACCESS

Site 03 benefits from its location within Port Bienville and proximity to the industrial park’s marine facilities, although the property does not have direct dock frontage.

ChatGPT Image Aug 11, 2026, 03_13_38 PM_

U.S HIGHWAY 90

2.7 miles / 4 minutes

ChatGPT Image Aug 11, 2026, 03_13_52 PM_

INTERSTATE 10

12.3 miles / 14 minutes

AVAILABLE UTILITIES

ELECTRIC

25 kV distribution and 115 kV transmission serve Port Bienville. Current working available substation capacity is approximately 4 MW. A new Coast Electric substation project is advancing.

NATURAL GAS

Natural gas service is available within industrial park, but a direct connection is not currently available to Site 02. Any future service extension would require utility coordination. 

WATER

Port Bienville is served by 12-inch water infrastructure at approximately 55 psi. A 500,000-gallon water storage tank has been completed, and a new interconnector project is in progress to strengthen system supply and redundancy.

WASTEWATER

Port Bienville is served by the Western Regional wastewater treatment system. The current technical baseline treatment capacity is 0.2 MGD. Expansion alternatives have been studied but have not yet been constructed.

FIBER

Fiber service is available from C Spire, AT&T, and CoastConnect.

ChatGPT Image Aug 12, 2026, 08_58_01 AM.png

VIEW INTERACTIVE GIS MAP

Explore Site 05 and surrounding infrastructure with our interactive GIS mapping platform. 

SITE DOCUMENTS

INTERESTED IN SITE 05?

Our economic development team is available to provide additional site information, utility coordination, due diligence materials, and assistance evaluating our sites for your project.

228.467.9231

bottom of page