top of page

STENNIS AIRPORT SITE 03

3-ACRE AIRFIELD ACCESSIBLE SITE

Stennis Airport Site 03 is a 3-acre aviation and light-industrial development site located at Stennis International Airport in Hancock County, Mississippi. Formerly used as a U.S. Coast Guard office and trailer site, the property retains paved parking and fencing that may support future redevelopment. Taxi Lane Sierra is currently under construction and is expected to provide direct airfield access upon completion, positioning Site 03 for small hangar, aviation service, aerospace-support, and related development.

KHSA Site 02 - Site Map PNG.png

3-Acres
Airfield Site

Utilities
Available

Moderate Development Readiness

Future Apron Access

Target Industries:

Small Hangar, Aviation Service, Aerospace Support

PROPERTY OVERVIEW

KHSA Site 03 offers approximately 3 acres for aviation and light-industrial development at Stennis International Airport. The property was previously used as a U.S. Coast Guard office site. The office trailers have been removed while the previous gravel parking and fencing were left in place.

​

Planned Taxi Lane Sierra improvements are expected to provide future direct airfield access, making the site well suited for small aviation, aerospace-support, and related light-industrial uses.​

​

Property Type: 

Industrial Site

Ownership:

Hancock County Port &

Harbor Commission

Available For: 

Ground Lease

Total Acreage:

3 Acres

Developable Acreage:

3 Acres

Development Readiness:

Moderate

Zoning:

Light Industrial

Current Site Condition:

Cleared and flat

Boundary Survey:

Completed

Phase 1 Environmental Site Assessment:

Not Completed

Geotechnical Study:

Not Completed

Topographic Data:

Not Completed

Wetlands Delineation:

Not Completed

Wetlands Mitigation:

Not Completed

Cultural Resources Study:

Not Completed

Not Completed

Endangered Species Study:

Not Completed

Federal Wetland Permit:

DEVELOPMENT READINESS

KHSA Site 03 has a completed boundary survey and benefits from prior site development, including existing parking and fencing. Additional technical and environmental due diligence may be required depending on the proposed project and final development footprint.

AIRFIELD ACCESS

ROAD ACCESS

Fred & Al Key Road

APRON ACCESS - In Progress

Taxi Lane Sierra is currently under construction and will provide direct airfield access to Site 03 upon project completion.

ChatGPT Image Aug 11, 2026, 03_13_52 PM_

INTERSTATE 10

2.2 miles / 4 minutes

ChatGPT Image Aug 11, 2026, 03_13_38 PM_

U.S HIGHWAY 90

8.0 miles / 10 minutes

PHYSICAL CHARACTERISTICS

FEMA FLOOD CONDITION

Outside mapped flood zone

APPROXIMATE SITE ELEVATION

18 feet

KNOWN EASEMENTS

None Identified

AVAILABLE UTILITIES

Utility capacities and final service availability are subject to project-specific verification with the applicable utility provider.

ELECTRIC

Electric service is provided by Coast Electric through 25 kV distribution with 115 kV transmission serving the airport area. Current excess system capacity is approximately 10 MW. 

NATURAL GAS

Natural gas service is provided by Delta Utilities through a 4-inch line serving the Stennis International Airport area.

WATER

The airport-area water system has approximately 4,000 GPM of design capacity and is currently operating at less than 50 percent utilization.

WASTEWATER

The airport-area wastewater system is rated at 1.5 MGD and also serves wastewater flows from NASA Stennis Space Center.

FIBER

Fiber service is available from C Spire, AT&T, and CoastConnect.

ChatGPT Image Aug 12, 2026, 08_58_01 AM.png

VIEW INTERACTIVE GIS MAP

Explore Site 03 and surrounding infrastructure with our interactive GIS mapping platform. 

SITE DOCUMENTS

INTERESTED IN SITE 03?

Our economic development team is available to provide additional site information, utility coordination, due diligence materials, and assistance evaluating our sites for your project.

228.467.9231

bottom of page