top of page

NASA PROJECT READY NORTH

250-Acre Aerospace & Technology Development Site

NASA Project Ready North is a large-scale development opportunity within the Stennis Space Center Fee Area, offering approximately 250 acres for aerospace, defense, autonomous systems, advanced technology, research, and mission-support development. The property has completed substantial site due diligence and is certified through the Mississippi Power Project Ready® Program.

Nasa SSC - Project Ready North.png

190-Acres
Developable

All Utilities
Available

Project Ready Certified Site

High Development Readiness

PROPERTY OVERVIEW

Project Ready North offers approximately 250 acres within NASA’s Stennis Space Center Fee Area for large-scale aerospace, technology, defense, research, and advanced-manufacturing development. The site was specifically evaluated for commercial development and has completed substantial due diligence through the Mississippi Power Project Ready process.

​

Its location at the northern edge of the Stennis development area provides the potential for phased growth while allowing future commercial operations to remain closely connected to NASA, federal agencies, defense activities, and the broader Stennis technology ecosystem. The Enterprise Park study specifically identified Project Ready North as well positioned for phased expansion by both existing Stennis tenants and incoming companies.

Available For: 

Long-Term Lease

Total Acreage:

250 Acres

Developable Acreage:

190 Acres

Development Readiness:

High

Target Industries:

Aerospace, Defense, Autonomous systems, advance manufacturing, data center, federal support operations

Zoning:

Heavy Industrial

Current Site Condition:

Undeveloped Greenfield

Property Type: 

Industrial Site

Ownership:

Nasa Stennis Space Center

DEVELOPMENT READINESS

Project Ready North has undergone significant technical and environmental evaluation as part of its Mississippi Power Project Ready certification and subsequent Stennis development planning. NASA and its partners have completed site investigations intended to identify development opportunities, environmental constraints, infrastructure needs, and potential development configurations before a specific tenant is selected.

​

Boundary Survey:

Not Completed

Phase 1 Environmental Site Assessment:

Completed

Geotechnical Study:

Completed

Topographic Data:

Available

Wetlands Delineation:

Completed

Wetlands Mitigation:

Not Completed

Cultural Resources Study:

Completed

Completed

Endangered Species Study:

Not Completed

Federal Wetland Permit:

PHYSICAL CHARACTERISTICS

Development Areas Planned Around Site Constraints

Project Ready North contains wetlands and floodplain areas within the overall property, but development planning has focused on avoiding constrained portions of the site. The site is generally relatively flat, and final grading, foundation design, stormwater management, and soil improvements will depend on the requirements and location of the selected project.

Floodplain

Approximately 45.4 acres identified within the overall site. Those areas were not proposed for development in prior planning.

Wetlands

A wetlands delineation identified that wetlands are present. Development concepts focus on available upland areas and avoidance where feasible.

Topography & Soils

The topography of Enterprise Park is relatively flat with the greatest elevation change located in the floodplain and wetland areas.

NASA MISSION COMPATIBILITY

Built for Companies That Support the Stennis Mission

Development at Project Ready North is intended for companies and organizations whose operations complement NASA Stennis Space Center and its federal, defense, aerospace, technology, and research missions.

Prospective tenants are subject to NASA review for mission compatibility.

TARGET INDUSTRIES

Information Technology

Unmanned Systems

Commercial Aerospace

Defense

Research & Development

Advanced Manufacturing

DEVELOPMENT FRAMEWORK

Long-Term Federal Development Opportunity

Development at Project Ready North is intended for companies and organizations whose operations complement NASA Stennis Space Center and its federal, defense, aerospace, technology, and research missions.

Enhanced Use Lease Framework

Commercial development coordinated through NASA with mission-compatibility review and project-specific approvals.

STRATEGIC LOCATION

Connected to the Stennis Aerospace Ecosystem

Project Ready North is positioned at the northern edge of the Stennis Space Center development area, providing access to the region’s concentration of NASA, federal, defense, aerospace, and technology activity while allowing for a commercial development model distinct from the core secured campus.

Federal City Proximity

Located Inside the SSC Fee Area

Waterway Access

No Direct Access To Industrial Canal

Rail Service

No

Nearest
International Airport

New Orleans International Airport MSY

Nearest Highway

MS Highway 607

Nearest Interstate

Interstate 10

AVAILABLE UTILITIES

ELECTRIC

Project Ready North is served by 13 kV electric distribution infrastructure. Final electrical capacity, service configuration, redundancy, and any project-specific improvements should be coordinated based on the requirements of the prospective tenant.

WATER

Project Ready North is served by a 16-inch water line. Mississippi Power identifies the supporting water system with 7 million gallons per day of total capacity and approximately 3.1 MGD of excess capacity. Project-specific flow and allocation should be confirmed based on facility requirements.

NATURAL GAS

An 11-inch natural gas line operating at 50 PSI is located on-site, providing a significant infrastructure asset for industrial and technology users requiring natural gas service. Final flow availability and project-specific service requirements should be confirmed during project evaluation.

WASTEWATER

Project Ready North is served through the Hancock County Utility Authority's wastewater system, which has a rated capacity of approximately 1.5 million gallons per day. NASA wastewater flows are routed into this same broader system. Current total flow and project-specific allocable capacity should be confirmed with HCUA for individual development projects.

ChatGPT Image Aug 12, 2026, 08_58_01 AM.png

VIEW INTERACTIVE GIS MAP

Explore Project Ready North and surrounding infrastructure with our interactive GIS mapping platform. 

SITE DOCUMENTS

INTERESTED IN THIS SITE?

Our economic development team is available to provide additional site information, utility coordination, due diligence materials, and assistance evaluating our sites for your project.

228.467.9231

bottom of page