top of page

NASA PROJECT READY SOUTH

150-Acre Aerospace & Technology Development Site

Project Ready South is a 150-acre development opportunity within NASA’s Stennis Space Center Fee Area, positioned immediately adjacent to the Federal City and existing Stennis infrastructure. The site is certified through the Mississippi Power Project Ready Program and offers a strategic location for aerospace, defense, autonomous systems, advanced technology, research, and mission-support development.

Nasa SSC - Project Ready North.png

150-Acres
Developable

All Utilities
Available

Project Ready Certified Site

High Development Readiness

PROPERTY OVERVIEW

Project Ready South provides approximately 150 acres for commercial development within the Stennis Space Center Fee Area. Located immediately adjacent to existing Federal City development and infrastructure, the property provides companies an opportunity to establish operations in close proximity to NASA, federal agencies, defense activities, research organizations, and other Stennis tenants.

 

The site was evaluated specifically for commercial development and certified through the Mississippi Power Project Ready Program. Its proximity to the established Stennis campus and infrastructure creates opportunities for closer integration with existing government and commercial operations.

Available For: 

Long-Term Lease

Total Acreage:

150 Acres

Developable Acreage:

150 Acres

Development Readiness:

High

Target Industries:

Aerospace, Defense, Autonomous systems, advance manufacturing, data center, federal support operations

Zoning:

Heavy Industrial

Current Site Condition:

Undeveloped Greenfield

Property Type: 

Industrial Site

Ownership:

Nasa Stennis Space Center

DEVELOPMENT READINESS

Project Ready South has undergone extensive technical and environmental evaluation through the Mississippi Power Project Ready process and subsequent Stennis development planning. Phase I environmental, endangered species, cultural resources, geotechnical, and wetlands studies have been completed and are available for project evaluation.

Boundary Survey:

Not Completed

Phase 1 Environmental Site Assessment:

Completed

Geotechnical Study:

Completed

Topographic Data:

Available

Wetlands Delineation:

Completed

Wetlands Mitigation:

Not Completed

Cultural Resources Study:

Completed

Completed

Endangered Species Study:

Not Completed

Federal Wetland Permit:

PHYSICAL CHARACTERISTICS

Certified and Evaluated for Future Development

Project Ready South is generally flat and was selected in part for its favorable development characteristics. The 2020 Stennis planning study identified no 100-year floodplain within the Project Ready South site and noted that wetlands present within the property were not expected to prevent development.

Floodplain

No 100-year floodplain identified within the site in prior planning.

Wetlands

A wetlands delineation identified that wetlands are present. Development concepts focus on available upland areas and avoidance where feasible.

Topography & Soils

The topography of Enterprise Park is relatively flat with the greatest elevation change located in the floodplain and wetland areas.

NASA MISSION COMPATIBILITY

Built for Companies That Support the Stennis Mission

Development at Project Ready South is intended for companies and organizations whose operations complement NASA Stennis Space Center and its federal, defense, aerospace, technology, and research missions.

​

Its location immediately adjacent to the Federal City provides opportunities for companies seeking close integration with existing Stennis organizations while operating within a dedicated commercial development environment. Prospective tenants and proposed uses remain subject to NASA review for mission compatibility.

Prospective tenants are subject to NASA review for mission compatibility.

TARGET INDUSTRIES

Information Technology

Unmanned Systems

Commercial Aerospace

Defense

Research & Development

Advanced Manufacturing

DEVELOPMENT FRAMEWORK

Long-Term Federal Development Opportunity

Development at Project Ready North is intended for companies and organizations whose operations complement NASA Stennis Space Center and its federal, defense, aerospace, technology, and research missions.

Enhanced Use Lease Framework

Commercial development coordinated through NASA with mission-compatibility review and project-specific approvals.

STRATEGIC LOCATION

Connected to the Stennis Aerospace Ecosystem

Project Ready South is located immediately adjacent to existing development within the Stennis Federal City, providing closer proximity to established facilities, infrastructure, and federal operations. The site's position also provides convenient access to MS 607 and the broader regional transportation network.

​

The 2020 Stennis site-suitability analysis actually ranked Project Ready South highest among the locations evaluated, citing its absence of developable land within the 100-year floodplain, adjacency to MS 607 and a local connector road, Project Ready certification, and its ability to provide a natural expansion path toward Project Ready North.

Federal City Proximity

Located Inside the SSC Fee Area

Waterway Access

No Direct Access To Industrial Canal

Rail Service

No

Nearest
International Airport

New Orleans International Airport MSY

Nearest Highway

MS Highway 607

Nearest Interstate

Interstate 10

AVAILABLE UTILITIES

ELECTRIC

Project Ready North is served by 13 kV electric distribution infrastructure. Final electrical capacity, service configuration, redundancy, and any project-specific improvements should be coordinated based on the requirements of the prospective tenant.

WATER

Project Ready North is served by a 16-inch water line. Mississippi Power identifies the supporting water system with 7 million gallons per day of total capacity and approximately 3.1 MGD of excess capacity. Project-specific flow and allocation should be confirmed based on facility requirements.

NATURAL GAS

An 11-inch natural gas line operating at 50 PSI is located on-site, providing a significant infrastructure asset for industrial and technology users requiring natural gas service. Final flow availability and project-specific service requirements should be confirmed during project evaluation.

WASTEWATER

Project Ready North is served through the Hancock County Utility Authority's wastewater system, which has a rated capacity of approximately 1.5 million gallons per day. NASA wastewater flows are routed into this same broader system. Current total flow and project-specific allocable capacity should be confirmed with HCUA for individual development projects.

ChatGPT Image Aug 12, 2026, 08_58_01 AM.png

VIEW INTERACTIVE GIS MAP

Explore Project Ready South and surrounding infrastructure with our interactive GIS mapping platform. 

SITE DOCUMENTS

INTERESTED IN THIS SITE?

Our economic development team is available to provide additional site information, utility coordination, due diligence materials, and assistance evaluating our sites for your project.

228.467.9231

bottom of page